The following is a list of applications to the Committee of Adjustment and Toronto Local Appeal Body (TLAB) that have been submitted for properties in our neighbourhood, updated to Sept. 8, 2024
Click on the property address and you can review the Supporting Documentation for the Application such as the notice, the plans submitted, the application for variance and submissions supporting or objecting to the application. Information is updated when new documents are submitted.
Below each address is the hearing date that has been scheduled.
ACTIVE
To construct a new two-and-one-half-storey detached dwelling with a front integral garage (in the basement/below grade level), a rear second storey balcony, as well as front and rear third storey roof decks. Also, to construct a front first storey green roof garden platform on a part of the roof of the integral below grade garage, and a front yard parking pad, partially covered by a front canopy. A new in-ground pool and a hot tub will be constructed in the rear yard. The existing two-and-one-half-storey detached dwelling with integral garage will be demolished.
[Note: The house has already been demolished]
Hearing scheduled for Wednesday April 24 at 9:30am – Committee Room 3, Second Floor, City Hall
To alter the existing three-storey detached dwelling by constructing a three-storey addition above the attached one-storey garage (with front balconies on each level). Also, to construct a partial fourth storey addition (with a rooftop deck and pergola) above the existing three-storey dwelling. There will be a total of four residential dwelling units on this lot (currently, there are three residential dwelling units).
Hearing scheduled for Wednesday May 8 at 9:30am – Committee Room 2, Second Floor, City Hall
To alter the existing two-and-one-half-storey detached dwelling by constructing a new attached two-car garage, fronting Nina Street. Also, to construct a two-storey addition (above this new garage) with a raised deck and stairs, as well as a third storey dormer. Further, to reconstruct the front porch and stairs.
Approved June 12, 2024 with conditions. The owner/applicant must submit a complete application for permit to injure or remove a City owned tree(s) and the rear deck must be constructed with opaque privacy screening
To construct a new three-storey detached dwelling with a front integral garage, a rear ground-level patio, and a rear third-floor walkout terrace. The existing front driveway, and rear deck will be maintained. The existing one-storey detached dwelling will be demolished.
Hearing scheduled for Wednesday May 15 at 9:30am – Committee Room 3, Second Floor, City Hall
To legalize and to maintain the front basement walkout entrance and two secondary suites within the basement that were constructed without an authorized building permit. Also, to alter the existing two-storey semi-detached dwelling by constructing a side deck.
Deferred
To alter the existing two-storey detached dwelling by constructing a complete third storey addition with a rear third storey deck, side (north) and rear three-storey additions, a partial front one-storey addition, an integral garage, a rear basement walkout, and a rear ground floor deck.
Committee of Adjustment Meeting October 16, 9:30am. Virtual Hearing / Committee Room 2, Second Floor, Toronto City Hall, 100 Queen Street West.